Start date Duration Cost Location Status
12/15/2023 5 Days 7350 AED Dubai, United Arab Emirates Register
11/15/2023 5 Days 7350 AED Dubai, United Arab Emirates Register
10/15/2023 5 Days 7350 AED Dubai, United Arab Emirates Register
9/15/2023 5 Days 7350 AED Dubai, United Arab Emirates Register
8/15/2023 5 Days 7350 AED Dubai, United Arab Emirates Register
7/15/2023 5 Days 7350 AED Dubai, United Arab Emirates Register
6/15/2023 5 Days 7350 AED Dubai, United Arab Emirates Register

Course description

The program consists of a Practical Assessment Exercise and Written Test papers on Equipment and Principles & Procedures for Introductory/Fundamental or Supervisory level based on the IADC/IWCF Certification Standards. The Certification Standards are based on a detailed analysis of the well control knowledge require, and the practical tasks that they have to master, in order to perform their jobs responsibly. The standards have been devised so that the measurement of their skills and knowledge can be assessed systematically. The method of assessing the performance of an individual, at all levels, is divided into the following sections:
•    A simulated practical exercise to assess practical skills
•    Written test papers on Equipment and Principles & Procedures to assess knowledge based skills

The certification program comprises separate levels of tests for Introductory/Fundamental or Supervisory in either Surface BOP Stack operations or Combined Surface/Subsea BOP Stack operations.

Audience

Drilling Representatives, Drilling Supervisors, Toolpushers, Drillers, Assistant Driller, who desire IWCF/WELLCAP certification as a Driller and Drilling Supervisor or for those who want a thorough knowledge of well control techniques, etc.

Prerequisites

Course content

    Introduction To Well Control
    Causes Of Kicks 
    Kick Detection 
    Pressure Concepts And Calculations 
    Procedures 
    Gas Characteristics And Behavior 
    Type Of Fluids 
    Constant Bottomhole Pressure Well Control Methods 
    Equipment 
    Organizing A Well Control Operation

comments (0)

leave a comment